Construction of six residential towers (665 apartments) on the east coast of “Peñón de Gibraltar” on lands reclaimed from the sea.
Construction of six residential towers (665 apartments) on the east coast of “Peñón de Gibraltar” on lands reclaimed from the sea.
In this project, the complete CPVC network has been replaced by PE-RC. This polyethylene has been joined in the first step (Discharge PN25) by spigot and electrofusion fittings, and in a second step (Distribution < PN16) with Series 1.
CPVC Advantages
CPVC Weak Points
Step 1 — PN25 Salt Water Discharge
Advantages
Weak Points
Step 2 — Salt Water Distribution for use as Toilet Flushing Water
Advantages
Weak Points